Difference between revisions of "EG Grading Policy"

From EG1004 Lab Manual
Jump to: navigation, search
Line 19: Line 19:
<tr><td>Abstract</td><td>10%</td></tr>
<tr><td>Abstract</td><td>10%</td></tr>
<tr><td>Introduction</td><td>20%</td></tr>
<tr><td>Introduction</td><td>20%</td></tr>
<tr><td>Experimental Work</td><td>35%</td></tr>
<tr><td>Data/Observations</td><td>20%</td></tr>
<tr><td>Discussion/Conclusion</td><td>15%</td></tr>
</table>
</table>



Revision as of 18:20, 1 June 2005

EG1004 Grading Policy

Starting Summer 2005 Term

Item% of grade
Teaching Assistant Lab Report Grades (technical content)15%
Writing Consultant Lab Report Grades (style and grammar)10%
Lab Quizzes10%
Recitation Presentations15%
Semester Long Project (breakdown below)30%
Final exam20%
Semester Long Project Bonuses and PenaltiesShown below

Lab Report Grading Breakdown

Section% of grade
Abstract10%
Introduction20%
Experimental Work35%
Data/Observations20%
Discussion/Conclusion15%

Semester Long Project Breakdown

Item% of grade
Milestone 1 presentation10%
Milestone 2 presentation10%
Milestone 3 presentation10%
Final presentation45%
Proposal cover letter25%
Component testingRequired
CommissioningRequired

Items shown as “Required�? do not have weight in calculating the semester long project grade, but must be successfully completed to receive a grade.

Semester Long Project Bonuses and Penalties

The following bonuses and penalties will be added to and subtracted from the semester long project:

Item% bonus or penalty
Early submission of project+10%
Completion of BDR project (line route)+3%
Completion of BDR project (roof route)+10%
Completion of BDR project (perimeter route)+3%
Completion of BDR project (tunnel route)+6%
Completion of BDR project (new route)+10%
Retrieval of BDR ball (any route)+10%
Completion of RDS project+10%
Completion of ISAR project+10%
Completion of Train Guidance project+10%
Completion of Supermarket project+3%
Each business day project is late-10%, up to -100%

The project is due the day of the final presentation. The project is considered late after that time. Note that after 10 business days, the project grade will be a zero.

For example, if you do an early submission of a BDR that uses the tunnel and the project is scored as an 80, your semester long project grade will be 80(the base)+10(early submission)+6(tunnel route), for a total grade of 96.

Return to Index