Difference between revisions of "Fall 2012 Project Configurations"
From EG1004 Lab Manual
(Created page with 'Displayed below are pictures of the Summer 2012 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Seme…') |
(No difference)
|
Revision as of 19:42, 10 August 2012
Displayed below are pictures of the Summer 2012 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.
Bomb Disarming Robot (BDR)
Search & Recovery Robot (SRR)
Disaster Relief Robot (DRR)
Retrieval and Delivery System (RDS)
|